WHT Instruments |
-
Telescope and Instrument check strategy
-
WHT instrument checks (CAGB, ISIS, AUX and PFIP)
-
INSTRUMENT REMOVAL check list
(to be prepared before any instrument change and to be completed
during the instrument change by the change leader); en Español
- GRACE:
NAOMI checks,
OASIS checks,
INGRID checks,
GRACE LN2 filling system,
INGRID 7 liter dewar re-filling system
- GHRIL:
1991 GHRIL user notes,
2013 GHRIL user notes,
CANARY,
Visiting instruments overview,
INTEGRAL change,
INTEGRAL checks,
GHRIL derotator change,
AF2 and WYYFOS pages
- CANARY:
CANARY safety rules,
Laser Safety System (LSS) checklist,
Laser Safety Duty Officer (LSDO) checklist,
Permit to work form,
Laser Traffic Control System (LTCS)
- CASS:
CASS A&G Box TFR workaround(4MS),
CAGB & ACAM PLC documentation,
LIRIS change,
LIRIS checks,
LIRIS hot pixels,
LIRIS pages,
ISIS change,
PNS change,
SAURON change
- PRIME:
BLT instrument change,
PFIP change,
AF2 and WYYFOS pages,
PAU Cam instructions
|