GHRIL derotator Change Checklist
Jürg Rey 5 December 2007
Revision 1.0
Description: WHT Ground-Based
High-Resolution Imaging Laboratory
Location : WHT Nasmyth Focus
Installing the optical derotator:
Team required : 3 (e.g. 3 mechanical)
Approximate time : 30 minutes
This should be carried out at least the day before the instrument is setup on
the table.
IMPORTANT: Disable limit switches! Derotators have NO rotation limit while INTEGRAL must have
the mechanical limit at the 0 degree mark on the rotator in place. This
consists of a mechanical cam screwed on the rotator.
Tick each box when complete |
Tick box |
|
|
1. Locate the derotator box in the WHT dome area and lift the derotator into GHRIL. Bracket and sling attached. |
|
2. Rotate GHRIL rotator to get access for removing the limit cam at the 0 degree mark. |
|
3. Rotate GHRIL rotator until the 180 degree mark on the rotator is on the top. |
|
4. While 1 person is lifting the derotator on the sling standing on the bench, 2 people need to push the rotator against the flange while at the same time supporting the weight and fasten the 6 screws. |
|
5. Rotate GHRIL rotator to the 0 degree mark. |
|
6. Mount the counterweight. |
|
Preparation Complete Signature : Date : |
Removing the optical derotator:
Team required : 3 (e.g. 3 mechanical)
Approximate time : 30 minutes
This should be carried out at least the day before the instrument is setup on
the table.
IMPORTANT: Enable limit switches! Derotators have NO rotation limit while INTEGRAL must have
the mechanical limit at the 0 degree mark on the rotator in place. This
consists of a mechanical cam screwed on the rotator.
Tick each box when complete |
Tick box |
|
|
1. Rotate GHRIL rotator to get access for removing the counterweight. |
|
2. Remove the counterweight. |
|
3. Rotate GHRIL rotator until the 180 degree mark on the rotator is on the top. |
|
4. Mount the bracket holding the sling for lifting the derotator. |
|
5. While 1 person is holding the derotator on the sling standing on the bench, 2 people need to undo the 6 screws. When undoing the last screws push the rotator against the flange before slowly removing. |
|
6. Rotate GHRIL rotator to get access for mounting the limit cam at the 0 degree mark. |
|
7. Store the counterweight in the box below the rotator and the derotator in its box in the dome area. |
|
Preparation Complete Signature : Date : |
JR Revision 1.0, 05/12/2007