PNS MANUAL
The PN.S was commissioned at the WHT in July 2001. In order to
run the instrument it has to be mounted and cabled appropriately.
In addition a PC has to be connected via cables. At the same time
some knowledge of the WHT control systems is required. This page
and those linked from it will be used to collect this
information, and later similar information about the PN.S at the TNG.
See also old operations manual
Installation
Operation
The PN.S itself
Observing at the WHT
Removal and Storage
about this document
We need your input to keep these notes up-to-date.
Please add to this document, or create new ones which can be
linked from it. Mail your input to the webmaster.
Documents of this background colour
are part of a set linked from this manual.html