Next: Command-line interface validation
Up: Acceptance testing
Previous: Documentation standards
The building procedures should conform to any documentary standard provided to the developers by ING. Any non-conformance must be justified by the developers and agreed with ING before delivery.
All software will be built from source according to the documentary instructions provided with the system, the Software Transfer Document, on the target machines at ING. The delivered software system must build successfully when the instructions are followed. Failure to build will be regarded as a failure of the software system.