Optical maintenance


 

Plans for maintenance

 

With optical maintenance the monthly work is meant, which should be carried out by an optical expert or people assigned by him. The main work on the optical maintenance is the quality control of the optics, which means that the optical expert has to visit the site where the optical elements are in a regular basis. The maintenance procedure contains taking measurements of the different parameters of the optical components, analysing the results and taking the necessary action based on the investigation. Naturally, feedback from the observers is needed also in order to monitor thoroughly the quality of the optical components. The way of doing this could be to contact the optical expert by e-mail or use the fault database or the filter database. All of the mentioned procedures have to be documented, stored and made available for the competent staff. These are the links, where the optical maintenance related information could be find:

It is useful to create a schedule for the optical maintenance of the different optical components. Together with the astronomers the following schedule have been set for the optical maintenance:

 

Main mirrors

 

Components

Inspection

Measure

Clean - CO2

Clean - vapour washing Aluminising

WHT primary mirror

visual inspection every week from AP3

measure reflectivity

1 month

1 month

only if necessary (massive contamination, stains, etc), probably once in a year 2-3 years, depending on the measurements and surface investigation

WHT secondary mirror

visually every week

measure reflectivity

6 months

6 months

only if necessary (massive contamination, stains, etc) 2-3 years, depending on the measurements and surface investigation

WHT tertiary mirror

visually every week

measure reflectivity

6 months

6 months

only if necessary (massive contamination, stains, etc) 2-3 years, depending on the measurements and surface investigation

 

Other optical elements

 

Components

Measure

Inspect  throughput

Clean

Diffraction gratings

1 year

3 months

never

Collimators

1 year

3 months

as required

Filters in spectrographs

2 year

3 months

6 months

Dichroics in spectrographs

2 years

3 months

6 months

Filters in imaging mode

2 years

6 months

on use/as required

Liquid CuSO4 filters

3 months

3 months

refill as required

Derotators

1 year

3 months

as required

CCD's

6 months

at change

 

CCD windows

never

at change

at change

 

 