This webpage contains information on the maintenance procedures of the optics systems of the ING.

Optical action list


Open actions

Date when added Action Fault number Status Comment
15/11/2006 ADC has to be separated, and glued together again   pending The two prisms are not identical, there was deviation of the laser beam, when it was measured in the optics lab at SLO. Probably the gluing cause the problem. The manufacturer was ICOS.

http://www.icopticalsystems.com/

Finished actions

Date when added Action Fault number Status Comment Date when finished
22/02/2007 OASIS 33mm enlarger   Done The OASIS 33mm enlarger problem had been investigated. With the removal of the mask it was possible to eliminate vignetting and so the observations with the 33mm are now possible. Due to the removal of the mask some scattered light was detected. At the moment the mask is out of OASIS. For certain observations (faint targets) it could be important to reduce the scattered light, in this case well in advance (2-3 month) the T&I group should be contacted to do the job. Although due to the difficulty of the mask removal and installation is not recommended. 2010
01/04/2007

 

Scattered light in NAOMI

 

  Done

 

The source of the problem was found, the OSCA electronics module has some LED, which caused the light contamination in GRACE.

Some work has been done to eliminate the scattered light previously:

NAOMI_scattered_light.pdf

 

2009
03/01/2008 JKT primary and secondary mirror vashing   Done Reflectivity_results_page 03/01/2008
13/12/2007 INT primary mirror vapour washing   Done Reflectivity_results_page 13/12/2007
05/11/2007 ISIS red fold mirror change   Done During the ISIS alignment checks it turned out that the red fold mirror was in a terrible state. We decided to change it. Two fold mirrors were found at sea-level. The new red fold mirror was installed successfully. There is one more spare red fold mirror, it is stored in the General Optics cabinet (the floor under the Observing floor). 10/11/2007
05/11/2007 ISIS alignment checks   Done ISIS was brought to the test focal station and the alignment of the optical components were checked based on the alignment documents. The tools for the alignment were put back to their cabinets labelled "ISIS alignment tools" on the mezzaine floor (under the Observing floor). Some of the tools were so big they are stored close to the cabinets, but only on the floor or on the top of other cabinets. 23/11/2007
29/10/2007 WHT visual check   Done Reflectivity_results_page 29/10/2007
04/10/2007 WHT primary mirror snowcleaning   Done Reflectivity_results_page 04/10/2007
04/10/2007 INT primary mirror snowcleaning   Done Reflectivity_results_page 04/10/2007
03/10/2007 Problem regarding screw and washers for the filter adaptors for the PFIP filter wheel (see comments). #17861 Done One of the circular 76mm Taurus filter adaptors was missing screws and its retaining ring. 2 of the 50mm square filter adaptors were missing screws and washers. These adaptors are located in the WHT Prime Cabinet.

The 50mm square filter adaptors have now the screws and plastic washers, so they are fine. Regarding the 76mm Taurus filter holders, the retaining ring is still missing, but the screws and the washers are in their place. The washers are taped, so they can hold the filters inside the adaptor, so it also fine and could be used.

03/10/2007
29/09/2007 The filter coating on the Stromgen B filter (#200) for the WFC is scratched. #17854 Investigate more The filter coating on the Stromgen B filter (#200) for the WFC is seriously scratched away over a large portion of the filter area.

After the inspection of the filter it could be seen that it is indeed seriously scratched and probably this affect the performance of the filter. The reorder of the filter is really difficult and extremely expensive (low number filters to be ordered - high cost) according to the experiences. Since we can not have a new filter, the only thing that could be done is the measurement of the filter`s spectral characteristics and comparison to previous data. 

01/10/2007
20/09/2007 Problem with image quality in U filter at WFC at INT. #17840 investigate more Problem with image quality in U filter at WFC at INT. I prepared (Tibor) a document about INT image quality within 40 x 40 arcmin for 360nm and 650nm. I analyzed the nominal configuration and one, in which the corrector lenses were shifted. It could be seen that the spots are increased significantly above 15 arcmin field radius in this latter case for both wavelengths. The spot diagrams for the nominal configuration were fine throughout the whole 20arcmin field radius (40` x 40`). According to the Zemax file the primary was tilted with 0.0001degree and the PF corrector lenses were shifted along the optical axis with 3mm in 2005.07.19. It seems that the spot elongation is the effect of the distortions introduced by the shift of the corrector lenses. (The tilt of the primary is not a problem, if we only take into account the 0.0001degree mirror tilt then the diagrams are the same with the original.) Questions: Do we know something about this 3mm shift of the 3 corrector lenses? Why was it applied exactly? How this image degradation above 15 arcmin radius affect the observations? According to the analysis the image quality degraded in the 650nm case as well. 22/11/2007
15/09/2007 The filter nr 198 in INT WFC is loose in its holder. #17824 Done The filter nr 198 in INT WFC is loose in its holder. The filter is fixed in its position, it could be used now. 29/10/2007
27/07/2007 Order 2pcs of GG495   Done During cleaning of the filters it turned out that there are scratches on the filter. It was necessary to order new filters; 2 pcs from GG495 (Size: 80mm x 35mm x 3mm) 24/09/2007
27/07/2007 ISIS GG495 filter is dusty (Order sorting filter for ISIS) #17774 Done It is cleaned, but there are scratches on the filter. It is necessary to order new filters; at least 2 pcs from GG495 27/07/2007
24/07/2007 WHT primary mirror snowcleaning   Done Reflectivity_results_page 24/07/2007
24/07/2007 INT primary mirror snowcleaning   Done Reflectivity_results_page 24/07/2007
19/06/2007 In ISIS Red Filter A (RFA) the GG495 filter is not  mounted properly   Done Mechanical work is needed to correct this. It is solved. 20/07/2007
30/04/2007 Order 2 pcs of new laser goggles   Done Send back the one wrong goggles, exchange it to the Art No.018.T0027.00, with the reinforced protector frame; order one more glass with Art No. 018.T0027.00 filter and reinforced protector frame

Company: http://www.lvg.com/

Contact: Tim Frieb

29/06/2007
13/02/2007 WYFFOS scattering analysis   Done There are two different places were identified, where if proper baffles are installed, the scattered light could be reduced. The analysis showed that apart from the scattered light, ghost images are also present. These could not be eliminated with baffling.

The report about the tests are here:

WYFFOS_scattered_light.pdf

07/06/2007
22/06/2007 INT primary mirror snowcleaning   Done Reflectivity_results_page 22/06/2007
26/05/2007 WYFFOS relay mirror installation and alignment   Done The freshly recoated mirror is installed and aligned in WYFFOS 31/05/2007
13/12/2006 WYFFOS relay mirror has arrived (it was sent to Denton US because of recoating)   Done Denton US, blue enhanced silver coating, DENTON FSS99-500 coating

www.dentonvacuum.com

17/05/2007
02/04/2007 Install the new filters at INT (IDS/A&G ASCF filters)   Done The current positions and filters:
position, filter type
0, Clear
1, GG385
2, GG395
3, GG495
4, RG630
5, BG28
(We have one more type of filter - BG38 -, which is not in the filter holder)

Filters: http://whtics.roque.ing.iac.es:8081/FilterDatabase/

02/05/2007
13/04/2007 WHT primary mirror snowcleaning   Done Reflectivity_results_page 13/04/2007
09/04/2007 Laser goggles investigation, labelling   Done Those laser goggles that could be used for GLAS has to be separated from the others. All of the laser goggles have to be labelled.

Specifications: Optical documents webpage

11/04/2007
01/02/2007 Order First Contact Deluxe Kit   Done It was ordered from LASER 2000 (www.laser2000.es)

Contact person: Berenice ALANIS-PIGEYRE (alanis@laser2000.fr)

28/02/2007
24/01/2007 Test the First Contact cleaning liquid on different optical components   Done http://www.photoniccleaning.com/

Tests were carried out on different optical components. The result that it could be used on smaller optical surfaces, eg on mirrors, filters, smaller lenses. It contains acetone, which is highly flammable, so it is not suggested to clean with this method on larger surfaces (though the company states that it is possible). Also not recommended to use on gratings.

01/02/2007
22/01/2007 Order of the following filters (2 pcs of each):
GG385, GG395, GG495, BG38, BG28, RG630. Their size is:  60x45x2mm
  Done The items were ordered from ITOS (www.itos.de)

Contact person: Sabine Sollinger (sollinger@itos.de)

Other company for ordering filters: Linos (www.linos.com)

02/04/2007
16/01/2007

 

Quotations on reflectivity, scattering and surface roughness measuring devices are needed. Also it is needed to contact SMS to get info about the reflectivity meter's not reliable operation.   Done Companies offering reflectivity meters:

1. Schmitt (http://www.schmitt-ind.com/products-services-measurement-systems.shtml)

2. Konica Minolta (http://www.konicaminolta.eu/products/industrial_products/overview)

3. DMO (http://www.dmo.be/web/framehtm.htm)

25/01/2007
29/01/2007 Aluminising the primary mirror of the WHT   Done Reflectivity_results_page 29/01/2007
18/01/2007 INT primary mirror snowcleaning   Done Reflectivity_results_page 18/01/2007
18/01/2007 Isis slit and dekker cleaning #17513 Done The Isis slit and dekker was cleaned with Balzers 2 liquid, optical tissue and gloves were used during the cleaning process

The optical cleaning elements could be found in the yellow cabinet next to the sink at the basement of WHT

18/01/2007
08/01/2007 WHT primary snowcleaning   Done Reflectivity_results_page 08/01/2007
20/12/2006 WHT primary mirror reflectivity measurements   Done Reflectivity_results_page 20/12/2006
05/12/2006 WHT primary mirror reflectivity measurements   Done Reflectivity_results_page 05/12/2006
28/11/2006 Vapour washing of the WHT primary mirror with a new technique   Done The technique was tested, one day we washed only the half of the mirror (on the 28th - right side, 29th - left side, 30th - right side again as seen from AP3). Results could be found here:

Reflectivity_results_page

And information on the process here:

Vapour_washing

28-29-30/11/2006
02/11/2006 WYFFOS spherical mirror reflectivity measurement   Done Results could be found here:

20061102WYFFOS.pdf

02/11/2006
02/11/2006 WYFFOS relay mirror change - use the spare   Done The WYFFOS relay mirror has to be sent for recoating (Denton US, blue enhanced silver coating, DENTON FSS99-500 coating needed) 02/11/2006
17/02/2003 CO2 cleaning WHT, INT, JKT        
03/02/2003 Reflectivity measurement WHT, INT, JKT        
20/01/2003 CO2 cleaning WHT, INT, JKT        
06/01/2003 Reflectivity measurement WHT, INT, JKT        
23/12/2002 CO2 cleaning INT, JKT        
09/12/2002 Reflectivity measurement WHT, INT, JKT        
16/09/2002 Filter measurement   Done Measure the TAURUS filters to be used in the WHT PFC

History:

17/09/2002 Checked the spectrograph at SLO.

It is not working correctly. Varian is contacted, waiting for reply.

20/09/2002 contacted Varian for support.

20/11/2002 Ordered new lamp from Varian.

 

 
12/06/2002 Update Filter database   Done History:

12/06/2002 Did not update filter database. Waiting till new version is out. Contacts Robert Greimel and Craige Bevil.

 
12/06/2002 Filter check   Done History:

12/06/2002 Checked filters and cleaned when necesary.

 
15-17/12/2002 WHT aluminising, Nasmyth washing   Done Reflectivity_results_page 15-17/12/2002
23/11/2002 WHT, INT, JKT CO2 cleaning   Done Reflectivity_results_page

Could not take pictures of WHT because of GRACE building

28/11/2002
04/11/2002     Done Reflectivity_results_page 14/11/2002
28/10/2002 WHT, INT CO2 cleaning   Done Reflectivity_results_page 30/10/2002
24/10/2002 JKT washing   Done Reflectivity_results_page 24/10/2002
07/10/2002 Reflectivity measurement WHT, INT, JKT   Done Reflectivity_results_page 08/10/2002
02/10/2002 INGRID alignment check with Sue Worswick PIMS issue 121   Found a detector tilt of 400 microns over the y direction and 100 microns over the x directrion. Also have to look at the PS positions. 08/10/2002
23/09/2002 CO2 cleaning WHT, INT, JKT     Reflectivity_results_page 25/09/2002
16/09/2002 Optical stock WHT cabinet   Done Need optical tissue is WHT cabinet 25/09/2002
13/09/2002 Filter check INT WFC #15304 Done 13/09/2002 Ask Danny Lennon if orientation fix does not change science output.

History:

13/09/2002 checked filter orientation. A few filters are wrongly orientated.

25/09/2002 Re orientated filters #199, #207, #210, #220

 

25/09/2002
13/09/2002
Reflectivity measurement WHT, INT, JKT     Reflectivity_results_page 13/09/2002
13/08/2002 Clean corrector plate of RoboDIMM.   Done washed it with water   25/09/2002