|
|
This page will show you the action of the optics group.
Optical action page
If you feel that I have forgotten
any optical issue in here, please send an email to: mfb@ing.iac.es
| Date |
Action |
Fault
number |
Status |
Comment |
| 17/02/2003 |
CO2 cleaning
WHT, INT, JKT |
|
|
|
| 03/02/2003 |
Reflectivity
measurement WHT, INT, JKT |
|
|
|
| 20/01/2003 |
CO2 cleaning
WHT, INT, JKT |
|
|
|
| 06/01/2003 |
Reflectivity
measurement WHT, INT, JKT |
|
|
|
23/12/2002
|
CO2 cleaning
INT, JKT
|
|
|
|
09/12/2002
|
Reflectivity
measurement WHT, INT, JKT
|
|
|
|
16/09/2002
|
Filter
measurement
|
|
17/09/2002
Checked the spectrograph at SLO.
It is not working correct. Varian is contacted,
waiting for reply.
20/09/2002 contacted Varian for support.
20/11/2002 Ordered new lamp from varian
|
Measure the
TAURUS filters to be used in the WHT PFC
|
12/06/2002
|
Update Filter
database
|
|
12/06/2002
Did not update filter database. Waiting till new version
is out. Contacts Robert Greimel and Craige Bevil.
|
|
12/06/2002
|
Filter check
|
|
12/06/2002
Checked filters and cleaned when necesary.
|
|
|
| Date |
Action |
Fault
number |
Status |
Comment |
Date
when finished |
15-17/12/2002
|
WHT aluminising, Nasmyth
washing
|
|
Done
|
Reflectivity
result page
|
15-17/12/2002 |
| 23/11/2002 |
WHT, INT, JKT
CO2 cleaning
|
|
Done |
Reflectivity
result page
Could not take pictures of WHT because of GRACE
building |
28/11/2002 |
04/11/2002
|
|
|
Done
|
Reflectivity
result page
|
14/11/2002
|
28/10/2002
|
WHT, INT CO2
cleaning
|
|
Done
|
Reflectivity
result page
|
30/10/2002
|
24/10/2002
|
JKT washing
|
|
Done
|
Reflectivity
result page
|
24/10/2002
|
07/10/2002
|
Reflectivity
measurement WHT, INT, JKT
|
|
Done
|
Reflectivity
result page
|
08/10/2002
|
02/10/2002
|
INGRID
alignment check with Sue Worswick
|
PIMS
issue 121
|
|
Found a
detector tilt of 400 microns over the y direction and
100 microns over the x directrion. Also have to look at
the PS positions.
|
08/10/2002
|
| 23/09/2002 |
CO2 cleaning
WHT, INT, JKT |
|
|
Reflectivity
result page |
25/09/2002 |
16/09/2002
|
Optical stock
WHT cabinet
|
|
Done
|
Need optical
tissue is WHT cabinet
|
25/09/2002
|
13/09/2002
|
Filter check
INT WFC
|
#15304
|
13/09/2002
checked filter orientation. A few filters are wrongly
orientated.
25/09/2002 Re orientated filters #199, #207, #210, #220
|
13/09/2002
Ask Danny Lennon if orientation fix does not change
science output.
|
25/09/2002
|
13/09/2002
|
Reflectivity
measurement WHT, INT, JKT
|
|
|
Reflectivity
result page
|
13/09/2002
|
13/08/2002
|
Clean
corrector plate of RoboDIMM.
|
|
Done washed
it with water
|
|
25/09/2002
|
|
|