Autofib 2 Engineering Setup Procedure

Section 1 : Gather AF2 Equipment

Below is a list of AF2 equipment that you need to set the instrument up in a development area.  Next to the item is the location where it should be stored.  If it isn't there the person incharge of the instrument (currently Kevin Dee kmd@ing.iac.es) should be informed.  A picture of each item will be displayed by clicking on each name.
 
 
ITEM LOCATION
AF2 Robot Storage Place ???
AF2 Small Fibre Module Storage Place ??? 
AF2 VME Crate AF2 Cabinet
AF2 Servo Control Amplifier AF2 Cabinet
AF2 V220 Monitor AF2 Cabinet
AF2 V220 Keyboard AF2 Cabinet
AF2 Inspection TV Monitor AF2 Cabinet
AF2 Mimic Display Monitor AF2 Cabinet
AF2 Science Fibre Light Source WHT Store Room

Mechanical Assistance is required to move the equiptment from there storage place to the development area.

Before connection the electrical cables, the small fibre module should be connected to the robot.  Assuming that you are going to use the small fibre module.

IMPORTANT  If testing Autofib 2 without the fibre module, it is important to place a metal object on the small module detection sensor.

Visually check the robot for any problems, particularly the gripper mechanism.
If needed lubricate Autofib2 using a cloth impregnated with oil.  Be careful not to get any lubricant on the prisms. DO NOT USE SPRAY LUBRICANTS OR COMPRESSED AIR TO CLEAN AND LUBRICATE AUTOFIB
Visually check the fibres on the field plate making sure that none of them have fallen.

Once all the equipment is gathered and accounted for then proceed with section 2.