
Index
This section describes the procedure to set up the instrument for a development environment. These instructions will be modified if AF2 is given a dedicate development area. Until such time it the procedure described will remain generic. Presently when AF2 isn't on the telescope it is setup in either the illuminising area or the instrumentation room.
The other sections of this website related to this procedure are
AF2 Engineering Instrument Removal
Procedure
AF2/WYFFOS Telescope Instrument
Setup Procedure
AF2/WYFFOS Telescope Instrument
Removal Procedure
This procedure has been divide into subsections that are easy to follow. If you are setting up AF2 for the first time and need some help then contact one of the AF2 experts.
Engineering Instrument Setup Procedure
| Section 1 | Gather AF2 Equipment |
| Section 2 | Electronical Connections |
| Section 3 | Software Tests |
| Section 4 | Allignment Procedures |
| Section 5 | Development Issues |
Note If the instrument is still on the telescope and you
want to set it up in the development area then you have to read the AF2/WYFFOS
Telescope Instrument Removal Procedure first.
| Created by Stephen Goodsell
sjg@ing.iac.es Last updated 9/01 |