Purpose: confirm that the system is ready for observing
Actors: duty engineer.
Outline: DE checks the disk space in the disk server, the starting of the system and the cameras to be used that night.
Related use cases:
Typical course of events:
Action | System response | |
---|---|---|
1. | The DE runs the use cases start DAS, start TCS and start CIA and ICS to get access to the system and check that the system starts correctly. | System locates and connects to cameras, starts DAS status displays, starts the automatic image display and starts the display of the night report. |
2. |
DE checks the disk space available on the disk server. If there is
too little, the DE
| |
3. | DE runs the use case test camera for each camera needed that night. | System supplies observations as requested, and displays them so that the DE can inspect the quality of the data. |