Previous: Setting up the Instrument
Up: Setting up the Instrument
Next: Detector
Previous Page: Setting up the Instrument
Next Page: Detector
- Check that the detector is correctly installed, cooled and functions electrically
- Install the test masks and initial programme masks in LDSS-2
- Check that the required filters and Hartmann masks are installed
- Check that the required grisms are installed
- Check focus, tilt and rotation by Hartmann tests
- Take distortion exposures of the matrix mask through each filter
- Do the positional calibration of masks
- Take dispersed flatfields through each mask for each grism