This document lists all the mission critical systems of Operations.
Scope
Only items that are maintained by the Operations Group are included in this document.
Equipment
| Item | Purpose | Reason | Location | Status |
| Tercery mirror | collecting light | no spare | WHT | a silver coated new Tercery being investigated (HARPS) |
| Aluminising plant control electronics | Aluminizing mirrors | failure could prevent cleaned, unique mirror from being aluminized | WHT | no spare controls; repair will be required on component level |
| AZ motor; EL motor | drive system | spare motor damaged | WHT | planned to investigate; repair & test |
| Flip ring motor | Turning flip ring | no spare | WHT | no spare |
| Decon lubrication unit | Lubricating WHT telescope gears | no spare | WHT | Michiel is evaluating spare unit |
| Hydraulic gear flow dividers | delivering constant flow to support pads | no spare | WHT | Michiel is evaluating spare |
| Marconi power amplifiers; 2 used for AZ; 2 for Elevation | drive system | special built amplifiers by Marconi for WHT | WHT | 1 spare only for 4 in use |
| Clip center interconnection area | Telescope cables ending on tag-strips or connectors all specially wired for the WHT | Lack of documentation; changes made in past not updated. Difficult fault finding. | WHT | requires revision, mayor job |
| Alarms and interlocks crate | Center where all the position-, limit- and emergency- switches and indicators are wire in | Custom made for the WHT by RGO. | WHT | no spare rack; built using wire wrapping technique |
| Marconi servo control rack | Custom build by Marconi | Custom build by Marconi. Difficult fault finding. | WHT | no spare rack |
| Focus motor | focus drive | no spare | WHT | no spare |
References
Document Location |
This document is only valid on the day it was
printed. http://www.ing.iac.es/~eng/spares/Ops_Critical_Systems.htm |
Revision History |
|
|
Version number |
Revision date |
Previous revision date |
Summary of changes |
Changes marked |
|
1.00 |
30 Apr 08 |
N/A |
Document reviewed and released |
JR |
Approvals |
This document requires the following approvals. |
|
Name |
Signature |
Title |
Date of Issue |
|
René Rutten |
|
Director |
30 Apr 08 |
| Juerg Rey | Head of Operations | 30 Apr 08 | |