| Tick each box when complete |
Tick box |
| 1. The handling trolley for the instrument to be
removed from the telescope must be lifted to the observing floor. |
|
| 2. ISIS should be lifted up to the observing floor.
The top of the handling frame can be removed so that the instrument is ready
to be mounted. |
|
| 3. Any electronic equipment, cabling or cryostats
not on the telescope should be taken to the observing floor. |
|
| 4. Any cryostats that are fitted to ISIS that are
not in use elsewhere should be mounted and the micrometers set-up |
|
| Preparation Complete
Signature :
Date : |
|
| Tick each box when
complete |
Tick box |
| 1. Make entry in log book :
DO NOT MOVE TELESCOPE |
|
| 2. IMPORTANT Position the telescope for change
: Azimuth 300 degrees & Elevation 90 degrees |
|
| 3. Lock telescope off control room.. |
|
| 4. Turn the Cassegrain rotator to correct angle and
line up the marks on ISIS and the A&G box. |
|
| 5. Put telescope ties in on the GRACE side. |
|
| 6. Remove all connections to the instrument to be
removed. |
|
| 7. Move instrument handling trolley under instrument,
align & attach. |
|
| 8. Unbolt and remove instrument. |
|
| 9. Check that ISIS lid is open. |
|
| 10. Move ISIS into place and bolt on. ONE person
only to check all bolts are tight. |
|
| 11. Lift down and store trolley |
|
| 12. Balance telescope. NB this should be done after
cabling up and switching on ISIS and the CCD controllers. Pre-testing can
then be carried out during balancing |
| Tick each box when complete |
Tick box |
| 13. Connect the ISIS air supply |
|
| 14. Connect the ISIS 4MS Network and Engineers' ports
to the NIU port and the RS232 box (labelled ISIS) respectively. |
|
| 15. Connect the ISIS EPICS crate to the DECNET. |
|
| 16. Connect and switch on the ISIS mains. |
|
| 17. Switch on : ISIS 4MS, ASL unit, ISISP EPICS crate
and SMDM 24v power supply. |
| Tick each box when complete |
Tick box |
| 18. Clean the CCD Cryostat windows. |
|
| 19. Clean the camera lenses |
|
| 20. Ensure the correct length filler tube is fitted
in each cryostat. HALF LENGTH tubes are needed for cryostats mounted on RED
and BLUE |
|
| 21. Set the capstans A,B & C and the rotation
for each cryostat using the micrometers as per the 'Capstan Settings Book' |
|
| 22. Clamp the capstans in correct order i.e. 1st
A - the hole, 2nd B - the slot, 3rd C - the flat. To PREVENT FORMING
AN EARTH LOOP ensure the micrometers including the D rotation micrometer are wound back and are not touching the frame. Also check that the clamps have insulating material fitted where they make contact with the capstan screws. CHECK isolation using a multimeter before connecting any cables to the cryostat. |
|
| 23. Set cryostat window flushing to ~50 litres/hour. |
| Tick each box when complete |
Tick box |
| 24. Connect the mains to the RED SDSU PSU. |
|
| 25. Connect an SDSU power cable between the RED SDSU
controller and the RED SDSU controller PSU. |
|
| 26. To be done be member of detector group taking
anti-static precautions Connect the RED CCD main signal cable static protection
box to the RED SDSU controller. |
|
| 27. Connect the RED temperature cable between the
RED SDSU controller and the RED cryostat. |
|
| 28. Connect the RED shutter cable from ISIS RED shutter
to the RED shutter control box and the other shutter cable from the the RED
shutter control box to the RED SDSU controller. |
|
| 29. Connect an ID cable between the RED cryostat
and the RED SDSU controller |
|
| 30. Connect the 2 fibres from the RED controller
back to the appropriate SPARC in the control room. |
|
| 31. Connect the mains to the BLUE SDSU PSU. |
|
| 32. Connect an SDSU power cable between the BLUE
SDSU controller and the BLUE SDSU controller PSU. |
|
| 33. To be done be member of detector group taking
anti-static precautions Connect the BLUE CCD main signal cable static
protection box to the BLUE SDSU controller. |
|
| 34. Connect the BLUE temperature cable between the
BLUE SDSU controller and the BLUE cryostat. |
|
| 35. Connect the BLUE shutter cable from ISIS BLUE
shutter to the BLUE shutter control box and the other shutter cable from the
the BLUE shutter control box to the BLUE SDSU controller |
|
| 36. Connect an ID cable between the BLUE cryostat
and the BLUE SDSU controller |
|
| 37. Connect the 2 fibres from the RED controller
back to the appropriate SPARC in the control room. |
|
| 38. Switch on RED and BLUE SDSU controller PSUs and
Shutter control PSUs. |
| Tick each box when complete |
Tick box |
| 39. In the control room on the old autoguider VME
type ?net Make sure you receive an 'acknowledgement' message
for ISIS |
|
| 40. At the instrument engineering terminal switch
box (right knob) select CASS INST. and using the right hand VT220 terminal
type .SLINKS This will test communication to each of the SMDMs and the encoder channels. Any faulty serial links will be listed. A faulty link to SMDM M ( thats a CAPITAL M ) can be ignored |
|
| 41. Still at the engineering terminal type ILS
and CONFIG These both give useful information about the health of the
instrument |
|
| 42. At the telescope use the buttons on the front
of the RED and BLUE shutter control boxes to test the operation and status
from the shutters. |
|
| 43. Bring up a window on the ICS and type PING
ISISP to check that the Epics ISIS Polarisation crate is on the network |
| Tick each box when complete |
Tick box |
| 44. Edit the detector configuration file as detailed
in the DE checklists |
|
| 45. Bring up ICL and ICS as detailed in the DE checklists. |
|
| 46. Update the magnet board. |
| Check each mechanism and tick each
box when complete |
Tick box |
| 47. Red Grating (this should only
be done after a change and not mid-run you will be disturbing the instrument
set-up ) |
|
| INRG |
|
| CENWAVE RED 4500 |
|
| CENWAVE RED 6500 |
|
| 48. Red Collimator (this should only
be done after a change and not mid-run you will be disturbing the instrument
set-up ) |
|
| INRCOLL |
|
| RCOLL 28000 |
|
| RCOLL 1000 |
|
| 49. Red Fold |
|
| INRFOLD |
|
| RFOLD 1 |
|
| 50. Red filter A |
|
| ISIS_INIT RED_FILTER_A |
|
| RFILTA 1 |
|
| RFILTA 2 |
|
| RFILTA 0 |
|
| 51. Red Filter B |
|
| ISIS_INIT RED_FILTER_B |
|
| RFILTB 1 |
|
| RFILTB 2 |
|
| RFILTB 0 |
|
| 52. Red Hartmann Shutter |
|
| RHART 1 |
|
| RHART 2 |
|
| RHART 3 |
|
| RHART 0 |
|
| 53. Blue Grating (this should only be
done after a change and not mid-run you will be disturbing the instrument
set-up ) |
|
| INBG |
|
| CENWAVE BLUE 6500 |
|
| CENWAVE BLUE 4500 |
|
| 54. Blue Collimator (this should only
be done after a change and not mid-run you will be disturbing the instrument
set-up ) |
|
| INBCOLL |
|
| BCOLL 28000 |
|
| BCOLL 1000 |
|
| 55. Blue Fold |
|
| INBFOLD |
|
| BFOLD 2 |
|
| BFOLD 1 |
|
| BFOLD 0 |
|
| 56. Blue Filter A |
|
| ISIS_INIT BLUE_FILTER_A |
|
| BFILTA 1 |
|
| BFILTA 2 |
|
| BFILTA 0 |
|
| 57. Blue Filter B |
|
| ISIS_INIT BLUE_FILTER_B |
|
| BFILTB 1 |
|
| BFILTB 2 |
|
| BFILTB 0 |
|
| 58. Blue Hartmann Shutters |
|
| BHART 1 |
|
| BHART 2 |
|
| BHART 3 |
|
| BHART 0 |
|
| 59. Slit Carriage Unit |
|
| INSLIT |
|
| MSLIT |
|
| LSLIT |
|
| 60. Set Slit Width (this should only
be done after a change and not mid-run you will be disturbing the instrument
set-up ) |
|
| SLIT 100 |
|
| SLIT 5000 |
|
| SLIT 1000 |
|
| 61. Dekker Slide |
|
| INDEK |
|
| DEKKER n ( where n = 1 to 8 ) |
|
| 62. Field Lens, Calcite Block and Polaroid
Tray |
|
| INFCP |
|
| FCP POLAROID |
|
| FCP FIELD_LENS |
|
| FCP CALCITE |
|
| FCP CLEAR |
|
| 63. Slit Door ( NB the dekker must be
at position 0 for access to the slit area ) |
|
| SLIT_DOOR OPEN |
|
| SLIT_DOOR CLOSE |
|
| 64. Quarter Wave Plate |
|
| INQW |
|
| QW_POLAR MOVE IN |
|
| QW_POLAR ROTATE 0.5 |
|
| QW_POLAR STOP ROTATE |
|
| QW_POLAR ANGLE 100 |
|
| QW_POLAR ANGLE 3000 |
|
| QW_POLAR MOVE OUT |
|
| 65. half Wave Plate |
|
| HW_POLAR MOVE IN |
|
| HW_POLAR ROTATE 0.5 |
|
| HW_POLAR STOP ROTATE |
|
| HW_POLAR ANGLE 100 |
|
| HW_POLAR ANGLE 3000 |
|
| HW_POLAR MOVE OUT |
|
| 66. Grating Doors and Grating Clamp Checks |
|
| REDGRAT 35000 (this moves the red grating square
on to the door) |
|
| BLUEGRAT 35000 (this moves the blue grating
square on to the door) |
|
| GRATING_DOOR OPEN (go out to ISIS and open
the door) |
|
| Use switches inside each grating compartment to check
that each set of clamps releases. Then ensure that the clamps are on before
closing the door. |
|
| GRATING_DOOR CLOSE |
|
| Using the WHT Duty Engineering notes for reference,
take an arc with each arm. If arc lines are obtained then it is time to hand
over to the SA to perform the final focussing |
|
| INSTRUMENT CHANGE COMPLETE
Signature :
Date : |
|
| HANDOVER TO SUPPORT ASTRONOMER
Signature
Date : |
|