Minutes of the Mechanical Group Meeting
|
Date 18
January 2001 |
| |
|
Attendance |
K Dee, P Morrall, M V D Hoeven, M Blanken, P
Jolley, S Rodriguez, J Carlos (Part Time), F Concepcion (Part
Time), D Gonzalez (Part Time) |
| |
|
No |
Details |
Action |
| |
|
|
|
1 |
Minutes of the previous meeting 9/11/00 |
|
| |
These were accepted as true |
|
| |
|
|
| |
|
|
|
2 |
Action items |
|
|
2.1 |
NAOMI Trolley |
|
| |
Perspex for cover was not machinable. PSM and
SRB to source different grade |
PSM, SRB |
| |
Requires brakes - Done |
|
| |
Requires a dedicated lifting frame - Done |
|
| |
Following the recent instrument change, the
procedures need updating - no progress |
JOLLEY |
| |
Removal of INGRID from NAOMI is difficult. New
lifting arrangement for INGRID to be defined - no progress SRB
to review and modify parts |
KMD, SRB |
| |
|
|
|
2.2 |
Cable Wrap |
|
| |
Document containing cable descriptions and
positions to be updated. CMWJ to be contacted - no progress |
KMD |
| |
|
|
|
2.3 |
Second Optical GHRIL Table |
|
| |
Following recent problems with the old optical
table with SCAM, the provision of a more stable table to be
reviewed. New table ordered delivery 6-8 weeks. |
KMD |
| |
|
|
|
2.4 |
INGRID |
|
| |
INGRID bracket needs reviewing to include
easier initial alignment and fine adjustments. Design completed
SRB to source manufacture |
SRB |
| |
|
|
|
2.5 |
GRHIL |
|
| |
GRHIL roof safe working to be reviewed.
Harnesses to be used - paper note to be distributed. Harness
now available, awaiting paper note. |
KMD |
| |
GRHIL roof to have dedicated strops - to be
ordered Done |
PSM |
| |
Roof access to be assessed and modifications
made. Risk assessment required. |
KMD, SRB |
| |
|
|
|
2.6 |
Snow cleaning |
|
| |
Need a regime for snow cleaning. MFB to ensure
its scheduled and completed with the aid of the telescope manager
and ops team leader. Ongoing |
MFB |
| |
Note to be issued clarifying the importance of
snow cleaning and the new procedures for doing so. No progress |
MFB/ KMD |
| |
|
|
| |
|
|
|
3 |
ING Overview |
|
| |
ING funding for the next 5 years have been
secured. The board has agreed upon the business plan. |
|
| |
|
|
| |
|
|
|
4 |
Project Reports |
|
|
4.1 |
INT Counterbalance |
|
| |
Requires some modifications to allow working in
all orientations. New gearboxes to be fitted and protective covers
required. Gearboxes ordered, covers might need mods. |
PSM |
| |
PSM to explain instrument change procedure to
SRB. Done |
PSM |
| |
PSM to replace centre screws Done |
PSM |
| |
PSM to install protective rubber bounce pads
– PSM sourcing suitable rubber |
PSM |
| |
Instrument change document needs updating. MVDH
to do and give copy to EJM |
MVDH |
| |
|
|
|
4.2 |
Safety |
|
| |
Jolley to convert and publish test certificates
on the intranet. September’s complete, no progress on April’s |
JOLLEY |
| |
PSM to liase with AKC to update the lifting
document on the intranet. The new document to include authorised
lifting personnel, the equipment that they can use and there
training requirements/schedules. Done |
PSM |
| |
Lifting Store needs sorting out. PSM and JC to
implement a routine for everyone to follow. No progress |
PSM/JC |
| |
|
|
|
4.4 |
Red CCD's |
|
| |
David's manufacturing these items expected
complete mid December. To be handed over mid/end January |
David |
| |
|
|
|
4.5 |
Small Fibres |
|
| |
Prism alignment going well. Jig to be finished.
Test to be performed. Done |
MVDH/ MFB |
| |
New fingers/slit unit to be ordered. Done |
JOLLEY |
| |
MFB/JOLLEY to arrange coating of the
microlenses. In Progress |
MFB/ JOLLEY |
| |
Transmission tests to be finalised No
progress |
MFB |
| |
RAW to detail new field plate. |
|
| |
Program suffering slippage due to late delivery
of items. May/June off-telescope testing, end July commissioning |
|
| |
|
|
|
4.6 |
OASIS |
|
| |
This is a new project to the group, so JOLLEY
gave a brief explanation of what it is and what we need to
provide. |
|
| |
|
|
|
4.7 |
Other Projects |
|
| |
PN Spectrograph - due next semester |
|
| |
LIRIS - due soon |
|
| |
Auxport Camera - no resources available. Now
called WAPCAM – has low priority to group |
|
| |
Long Camera - waiting for optical design and
resources |
|
| |
Near Earth Object (NEO) - close to getting
funding for JKT |
|
| |
Ultracam – Vik Dhillon’s 3 colour camera |
|
| |
|
|
| |
|
|
|
5 |
Maintenance |
|
|
5.1 |
Oil system at the WHT needs inspecting and
possible cleaning. No progress |
SRB/ KMD |
| |
|
|
|
5.2 |
For information only: KMD stated that care
should be taken when working around the WHT bull ring. The
microswitch has three positions and it is possible to drive the
telescope passed its end stops. IF YOU THINK THIS HAS BEEN
KNOCKED/MOVED THEN CHECK BEFORE RELEASING TELESCOPE. Done |
|
| |
|
|
|
5.3 |
Following the recent request the WHT secondary
mirror alignment was checked and found to be acceptable. Done |
|
| |
|
|
|
5.4 |
WHT Dome bogie replacement. SRB/PSM to get
price |
SRB, PSM |
| |
|
|
| |
|
|
|
6 |
Training |
|
|
6.1 |
All to actively look for relevant training
courses and present to SRB and KMD. |
ALL |
| |
|
|
|
6.2 |
David to attend edgeCAM course |
DAVID |
| |
|
|
| |
|
|
|
7 |
Administration |
|
| |
No Report |
|
| |
|
|
| |
|
|
|
8 |
A.O.B |
|
| |
|
|
|
8.1 |
Mechanical Design Support |
|
| |
Kevin to source extra short term design
support. Done |
KMD |
| |
|
|
|
8.2 |
Requests for any work that is deemed to be an
enhancement must come from the EMM and not individuals.
Work that is not an enhancement but necessary for the working of
the telescope to be carried out as normal. Done |
ALL |
| |
|
|
|
8.3 |
Fire risk assessment from Doug highlighted risk
due to the storage of excessive quantities of oil in the garage.
SRB and PSM to resolve with FC |
SRB, PSM, FC |
| |
|
|
|
8.4 |
Staff are reminded that this is a no smoking
site. KMD will pay particular attention to the mechanical workshop
and garage. Staff caught smoking will be disciplined accordingly. |
ALL |
| |
|
|
|
8.5 |
Staff are reminded that they should inform a
third party if they are operating machinery. Lone working is not
allowed on machine tools. |
ALL |
| |
|
|
|
8.6 |
FC needs a computer in the garage. Due to the
purchase of a new machine, old machines will be passed down
releasing one for FC |
|
| |
|
|
|
9 |
Next Meeting |
|
| |
8th March |
|