Minutes of the Mechanical Group Meeting |
Date |
4 October 2000 |
|||
|
|
||||||
|
Attendance K Dee, P Morrall, S Rodreigez, P Jolley, J Carlos (part time), David (part time) |
||||||
|
|
||||||
|
No |
Details |
Action |
||||
|
1 |
Minutes of the previous meeting |
|
||||
|
|
As no meeting had been held for a considerable time, no minutes were available. The focus of this meeting was solely to update KMD on recent work. As a consequence no project work was discussed |
|
||||
|
|
|
|
||||
|
2 |
Action items |
|||||
|
2.1 |
NAOMI Trolley |
|
||||
|
|
Requires a cover made over the whole table possibly from speadyframe and perspex |
PSM |
||||
|
|
Requires breaks |
SBR |
||||
|
|
Requires a dedicated lifting frame |
PSM |
||||
|
|
Following the recent instrument change, the procedures need updating |
JOLLEY |
||||
|
|
Removal of INGRID from NAOMI is difficult. New lifting arrangement for INGRID to be defined |
KMD |
||||
|
|
|
|
||||
|
2.2 |
Cable Wrap |
|
||||
|
|
Document containing cable descriptions and positions to be updated. CMWJ to be contacted |
KMD |
||||
|
|
|
|
||||
|
2.3 |
Second Optical GHRIL Table |
|
||||
|
|
Following recent problems with the old optical table with SCAM, the provision of a more stable table to be reviewed |
KMD |
||||
|
|
|
|
||||
|
2.4 |
INGRID |
|
||||
|
|
Instrument change schedules to reflect the following: Moving INGRID from cass to GHRIL 3 days Moving INGRID from GRHIL to cass 4 days |
KMD |
||||
|
|
Duty checks to include a test for sweating |
JOLLEY |
||||
|
|
INGRID bracket needs reviewing to include easier initial alignment and fine adjustments |
KMD |
||||
|
|
INGRID change document to be updated |
MFB |
||||
|
|
|
|
||||
|
2.5 |
GRHIL |
|
||||
|
|
GRHIL roof safe working to be reviewed |
KMD |
||||
|
|
GRHIL roof to have dedicated strops |
PSM |
||||
|
|
|
|
||||
|
2.6 |
Snow cleaning |
|
||||
|
|
To be reviewed |
KMD |
||||
|
|
|
|
||||
|
3 |
ING Overview |
|
||||
|
|
No report |
|
||||
|
|
|
|
||||
|
4 |
Project Reports |
|
||||
|
|
No reports |
|
||||
|
|
|
|
||||
|
5 |
Maintenance |
|
||||
|
|
No reports |
|
||||
|
|
|
|
||||
|
6 |
Training |
|
||||
|
|
No reports |
|
||||
|
|
|
|
||||
|
7 |
Administration |
|
||||
|
|
No Report |
|
||||
|
|
|
|
||||
|
8 |
A.O.B |
|
||||
|
|
|
|
||||
|
8.1 |
Thanks |
|
||||
|
|
Kevin and Servando thanked the group for the hard work and team work carried out over the previous month during there absence. |
|
||||
|
|
|
|
||||
|
9 |
Next Meeting |
|
||||
|
|
Provisionally 19 October 2000 |
|
||||