FOLDERS AND REPORTS AT LA GRAMA

 

 

 

1

SLR TECHNICAL NOTES 3 - CONTROL SOFTWARE

 

2

NEXT GENERATION TELESCOPES REPORT 4 25METER TELESCOPE MMT

 

3

KITT PEAK NAT. OB. TECH.REPORT.1 INTRO TO DESIGN OF HIGH VACUUM METALLISING CHAMBER

 

4

LEST FOUNDATION TECH.REPORT.7 LEST DESIGN STUDY

 

5

NGT TECH.REPORT 5 CONCEPT FOR 25 M TELESCOPE - THE 'SINGLE ARRAY' PART ONE

KPNO

6

NGT TECH.REPORT 2 CONCEPT FOR 25 M TELESCOPE - THE 'ROTATING SHOE ARRAY

KPNO

7

NGT TECH.REPORT 1 ASTRONOMICAL POTENTIAL & SCIENTIFIC USE FOR LARGE APERTURE OPT. TELESCOPE

KPNO

8

NATIONAL NEW TECH TELESCOPE - TECHNICAL DEVELOPMENT PROGRAMME REPORT 1

KPNO

9

NATIONAL NEW TECH TELESCOPE - TECHNICAL DEVELOPMENT PROGRAMME REPORT 10

KPNO

10

NATIONAL NEW TECH TELESCOPE - TECHNICAL DEVELOPMENT PROGRAMME REPORT 7

KPNO

11

THE NEW SOLAR MAGNETOGRAPH FOR THE CANARY ISLAND OBSERVATORY

THEMIS

12

TB1 DESK INTERWIRING WIRING SCHEDULES

 

13

TB1 CLIP CENTRE WIRING SCHEDULES

 

14

TB1 DESK TO CLIP CENTRE INTERWIRING WIRING SCHEDULES

 

15

TB1 DESK PANELS WIRING SCHEDULES

 

16

TB1 DESK TO CLIP CENTRE ON MOUNTING WIRING SCHEDULES

 

17

TB1 MECHANICAL SPECIFICATION SHEETS

 

18

TB1 ENGINEERING FACILITY PANELS WIRING SCHEDULES

 

19

TB1 ELECTRICAL SPECIFICATION SHEETS

 

20

1.0 M A&G UNIT A&B DRAWINGS

 

21

TREASURY PROCUREMENT POLICY COMMITTEE-GUIDANCE ON THE EC WORKS DIRECTIVE

 

22

DESIGN SHEETS NHO 4.2M TELESCOPE

 

23

4.2M A&G UNIT HANDLING TROLLEY

 

24

4.2M A&G UNIT

 

25

1.0M A&G BOX REPORT

E J MILLS 10/87

26

1.0M CCD A&G BOX

 

27

4.2M NHO TELESCOPE RECORDS 2nd EDITION

B MACK 8/84

28

WHT TELESCOPE GEARS

MARCONI

29

TESTS ON ROLLER ENCODER UNITS

MARCONI

30

2.5 A&G UNIT - NOTES

P A ELLIS

31

EXPERIMENT 'X' CARRIAGE 2.6M A&G UNIT

LITTON

32

2.5M A&G UNIT MODS AND TESTING

 

33

2.5M A&G UNIT MODIFICATIONS

 

34

NHO INST SECTION 2.5M TELE - ACQUISITION&GUIDER UNIT - DRAWINGS AND SKETCHES

 

35

NHO INST SECTION 2.5M TELE - ACQUISITION&GUIDER UNIT - TEST RESULTS

 

36

NHO INST SECTION 2.5M TELE - ACQUISITION&GUIDER UNIT - CALCULATIONS

 

37

NHO INST SECTION 2.5M TELE - A&G UNIT

P A ELLIS

38

NHO - DOMES AND BUILDINGS

 

39

INT TV FINDER

ELLIS

40

INT - CONVERSION DESIGN STUDY

GRUBB PARSONS

41

ER 430 DMS SOFTWARE RELEASE VERSION 1.3

 

42

STANDARD ASTRONOMICAL TELESCOPES SPECS AND PRICING

OSEM

43

CASSAGRAIN ATMOSPHERIC DISPERSION CORRECTOR 2.5 & 4.2

 

44

GENERAL MARCONI FILE

 

45

MARCONI RATE GENERATOR BOARD

 

46

MARCONI CLOCK BOARD

 

47

ANALOGUE PROCESSING BOARD

 

48

MARCONI COUNTER BOARD

 

49

SCHEMATICS ?

 

50

LOW DISPERSION SURVEY SPECTROGRAPH LDSS 2 OBSERVER MANUAL

 

51

LOW DISPERSION SURVEY SPECTROGRAPH LDSS 2 DURHAM-RGO WHT 92

 

52

LEXT REFERENCE MANUAL

 

53

6303 RESET PLUG IN BOARD ER 421

 

54

LEST TECHNICAL REPORT 9 PROJECT STUDY MAN.PLAN & CAPITAL BUDGET

 

55

NNTT TECHNICAL REPORT 2 REMOTE OBSERVING EXPERIMENT AT (KPNO)

 

56

NNTT TECHNICAL DEVELOPMENT PROGRAMME REPORT 9 DESCRIPTION & THEORY OF THE NOAO INFRARED

 

 

ADAPTIVE OPTICS PROGRAMME

NOAO

57

NNTT TECHNICAL DEVELOPMENT PROGRAMME REPORT 8 PROGRESS REPORT ON TELE DESIGN AND SITE

 

 

EVALUATION

NOAO

58

MECHANICAL DRIVE CONSIDERATIONS FOR THE 150" STELLAR TELESCOPE

KPNO

59

ELECTRICAL DRIVE CONSIDERATIONS FOR THE 150" STELLAR TELESCOPE

KPNO

60

NNTT TECHNICAL DEVELOPMENT PROGRAMME REPORT 4 A CONTINENTAL US OPTION FOR THE NNTT

NOAO

61

NGT REPORT 3 A CONCEPT FOR A 25M TELESCOPE - THE STEERABLE DISH

KPNO

62

EVALUATION OF TEXAS INST. 3 PHASE CCD#424 IN THE NOAO CCD CAMERA SYSTEM

NOAO

63

COLUMBUS PROJECT PHASE 1 REPORT

 

64

TECH.REP.28 PROCEEDINGS OF THE WORKSHOP ON ADAPTIVE OPTICS IN SOLAR OBSERVATIONS

LEST

65

NHO SPEC. FOR A DESIGN STUDY OF THE CONTROL SYSTEM FOR A 4.2M TELESCOPE

 

66

DESIGN STUDY FOR THE CONTROL SYSTEM FOR THE NHO 4.2 TELE. 1st PROGRESS REPORT

MARCONI

67

THE CALOR ALTO 3.5M TELESCOPE

 

68

LEST PROJECT EXECUTION

LEST

69

LA PALMA TECH. MAN. 22(APP3) INT PRIME FOCUS CCD FILTER WHEEL (VERSION 1)

P JORDAN

70

LA PALMA TECH. MAN. 56 COMSOL

PERKINS ELMER FORTH

71

ING USER MANUAL NO XXll - ISIS ASTRONOMERS GUIDE

 

72

LIST OF 4.2 BUILDING & DOME DIAGRAMS (KEPT BY RUTHERFORD)

 

73

LIST OF 1.0 BUILDING & DOME DIAGRAMS (KEPT BY RUTHERFORD)

 

74

LIST OF 2.5 BUILDING & DOME DIAGRAMS (KEPT BY RUTHERFORD)+B112

 

75

RGO BUILDING AT CAMBRIDGE - FINAL DRAWINGS

 

76

COMPUTER STUDIES ?

 

77

WHT SITE TESTING [BINDER]

 

78

WHT VISITORS GALLERY

 

79

TECHNICAL DESCRIPTION OF THE NOAO 8M TELESCOPE (DRAFT)

 

80

NNTT TECH.DEV. PROGRAMME REPORT 5 GRAVITY DEFLECTION ANALYSIS OF STRUCTURED MIRROR

KPNO

81

NNTT NATIONAL 15M TELESCOPE QUALITY PROGRESS REPORT ( 2 COPIES )

 

82

GEMINI A&G WFS (2 COPIES)

 

83

PACKING AND SHIPPING OF 4.2 ISIS SPECTROGRAPH TROLLEY AND LIFTING GEAR ALSO A&G SYSTEM

 

 

TROLLEY AND LIFTING GEAR

 

84

NHO 4.2 OPTICAL TELESCOPE BUILDING DESIGN PROPOSAL

FREEMAN FOX & P's

85

INT DOME ( 3 PAPERS )

 

86

ANGLO DUTCH TRANSIT CIRCLE BUILDING - BUILDING WORKS & MECH. & ELEC. SERVICES

 

87

INT DOME

 

88

WHT INSTRUMENT COMMISSIONING REPORTS

 

89

4.2 A&G COMMISSIONING

 

90

SLIT VIEWING PROBE

 

91

WEIGHTS AND MOMENTS

 

92

SYNCHRONOUS DRIVE OF HOISTING MACHINARIES

 

93

TB6 MECHANICAL SPECIFICATIONS SHEETS

 

94

TB6 ELECTRICAL SPECIFICATIONS SHEETS

 


Last Updated 08/05/00 Paul Jolley