 |
 |
| AF2 control electronics and cables |
AF2 handling frames |
 |
 |
| Prime focus rotator |
Removing the cover from prime focus |
 |
 |
| Attaching the telescope ties |
Attaching the telescope ties |
 |
 |
| Fitting the secondary mirror cover |
Removing the secondary mirror |
 |
 |
| Prime before fitting the rotator |
Fitting the prime rotator |
 |
 |
| Fitting AF2 Robot to the rotator |
Prime with rotator and AF2 robot |
 |
 |
| Rear connections to PFIP+ADC 4MS |
PFIP+ADC 4MS cabling |
 |
 |
| WYFFOS AF2 fibres and back illumination |
Guide fibre TV system |
 |
 |
| Fitting the auto guider and fibre module |
GHRIL patch panel and AF2 VME |
 |
 |
| GHRIL control desk |
Fibre storage rack on AF2 |
 |
 |
| Bare fibres entering the fibre module |
TV patch panel access hatch |
 |
 |
| AF2 access bolt |
Moving the fibre module for access |
 |
 |
| Fibre module access position |
Change completed-top view |
 |
 |
| Change completed-side view |
Change completed-side view |
 |
 |
| Rotator Cabling |
Rotator cabling |
 |
 |
| Rotator cabling |
Rotator cabling |
 |
 |
| Fibre connections, TV and 4MS |
Change completed-side view |
 |
|
| Change completed-side view |
|