Section 1 : Gather AF2 Equipment
Below is a list of AF2 equipment that you need to set the instrument up in a development area. The list contains the location of where the item should be stored. If the item is missing then the person responsible for the instrument (currently Kevin Dee kmd@ing.iac.es) should be informed. A picture of each item will be viewed by clicking on each items link.
NOTE The AF2 Cables link will give you a description on
the 19 cables that should be in the AF2 Cabinet.
| ITEM | LOCATION |
| AF2 Robot | Storage Place ??? |
| AF2 Small Fibre Module | Storage Place ??? |
| AF2 VME Crate | AF2 Cabinet |
| AF2 Servo Control Amplifier | AF2 Cabinet |
| AF2 VT220 Terminal | AF2 Cabinet |
| AF2 VT220 Keyboard | AF2 Cabinet |
| AF2 Inspection TV Monitor | AF2 Cabinet |
| AF2 Mimic Display Monitor | AF2 Cabinet |
| AF2 Science Fibre Light Source | WHT Store Room |
| AF2 Cables (19) | AF2 Cabinet |
Mechanical assistance is required to crane the equipment from there storage place to the development area. This assistance should be arranged with the Operations Team Leader either on the day of moving of preferably the day before.
Once all the equipment have been gathered in the development area, it
is a good idea to proceed with some basic mechanical checks as described
below.
Now we are ready for cabling the instrument, see Section 2.