qThis
procedure includes enough checks to serve as “pre-AO run” check list. Not everything
would be needed
on a normal day after the run has started
qIn
GRACE
qOutside
of GRACE
ØStarting
up the system
ØLaser
flattening the Deformable Mirror
ØWhite
light flat
ØSimplex
flat and checking image quality
Ø
Ø
Ø
Ø
Ø
Ø
q
q
q
Ø
Ø
q
q