Autofib 2/WYFFOS Telescope Instrument Setup Procedure

Section 7 : AF2/WYFFOS Daily Duty Checks *(must to updated)

This webpage contains the Duty Engineer checks that are performed daily whilst AF2 is on the telescope.  The commands that are to be typed at the ICL command line are given after the ICL prompt.

Testing AUTOFIB

  1. Waking the robot.
  2. Turn on the WYFFOS back-illumination.
  3. View a science fibre.
  4. View a guide fibre.
  5. Load the small fibre module.
  6. Turn off the backillumination
  7. Park the AF2 Robot
  8. Move the off-axis mobile probe into the field.
  9. Move the off-axis mobile probe back to the back position.
Testing the Westinghouse TV.
  1. At TV panel ensure that the gain is off then turn on both Prime and Cass systems. The cass system is turned on only to maintain sync.
  2. Turn the AF2 robot inspection lights on.
  3. Ensure all domes lights are off. If they are not then they have been overridden. Remove override with key switch before proceeding.
  4. Now the dome is dark and Autofib inspection lights are on. Turn on the gain of the prime camera and increase until you see the guide fibres. They are fibre bundles with a fibre in the middle.
  5. Turn off camera system ensure the gain is fully down and off.
  6. Turn the AF2 robot inspection lights off
  7. Sleep the robot
Testing WYFFOS

This is not a detailed check but proves communications. Moving other things like the grating can disturb the observers set-up.

  1. Check WYFFOS filter slide A
  2. Check WYFFOS filter slide B
ADC Test.
  1. Use the wyffos mimic to display corrector element positions.
WYFFOS Calibration Unit

This assumes that the WYFFOS calibration unit mimic is running.

  1. Select a calibration lamp. the process of doing so will turn it on.
  2. Select a filter.
  3. Select 'broken' on the Nysmith control panel on the telescope engineering desk.
  4. Take an exposure with the ccd.
  5. Check that the spectral lines are present on the ccd readout.
  6. Select 'GHRIL' on the Nysmith control panel on the telescope engineering desk.
  7. Turn the calibration lamp off.
To Test WYFFOS CCD

This assumes DMS and sparc real time display is running.

  1. Turn lights off in the dome.
  2. Ensure Nasmyth Flat is stowed for GHRIL.
  3. Setup WYFFOS and take a bias frame.
  4. Check bias frame.
Autoguider
  1. Reset the autoguider if required, see below for procedure.(not normally done during a check)
  2. Check to see if CCD is cooling or cold. If it's not type <start-up>
  3. <tv on> check sensitivity to light. Toggle between fields with <fm 1> and <fm 2>. Do not use the <field> command, the system hangs if there is no star.
  4. When finished type <tv off>.
To reset the autoguider, if required:
  1. The latest version of the AF2 autoguiding program is currently on a floppy disk.  Ensure that the AF2 version is in the autoguider disk drive.
  2. Reset the Autoguider VME crate.
  3. Quickly return to the Autoguider terminal Press <CTRL C> to abort task.
  4. Type <insite reload>. This forces the system to boot from the floppy.
  5. When prompted select <af2>
With the daily duty checks complete the last set of checks have to be done by the astronomer, see section 8.