This webpage contains the Duty Engineer checks that are performed daily
whilst AF2 is on the telescope. The commands that are to be typed
at the ICL command line are given after the ICL prompt.
Testing AUTOFIB
-
Waking the robot.
-
14:01:00 > afwake
-
This turns the AF2 power on. At ICL the Autofib mimic will update and all
the variables turn green. You should also hear the pneumatic gripper being
exercised. If this does not work it is probably either the system is accepting
local commands only or the VME needs booting in GHRIL. (See engineering
notes for detailed instruction.)
-
Turn on the WYFFOS back-illumination.
-
14:02:30 > afbackillum
on
-
This turns WYFFOS back-illumination. Backillumination sends light from
WYFFOS up the fibres to AF2. Also it turns on the TV back-illumination.
-
View a science fibre.
-
14:03:00 > afviewfibre
15
-
This moves the robot gripper camera to the co-ordinates for this particular
science fibre. On the Autofib monitor in the control room should be the
illuminated fibre. If you see no fibre check on WYFFOS mimic display that
backillum is on.
-
View a guide fibre.
-
14:05:30 > afviewfibre
32
-
>. As above but this checks that the backillumination is on to the guide
fibres. NB the illuminated fibre on the TV monitor looks smaller than a
science fibre, this is because a mask is in front of it.
-
Load the small fibre module.
-
14:06:30 > afloadm
-
This locates and re-affirms the fibre positions. NB This command turns
backillumination ON if it is not already on. This normally takes no more
than 10 minutes. No fibres are moved with this command. If it fails to
complete go to Autofib engineering notes.
-
Turn off the backillumination
-
Park the AF2 Robot
-
14:21:30> afparkr
-
This parks the robot to the edge of the fibre field but the power remains
on.
-
Move the off-axis mobile probe into the field.
-
14:25:00 > afmovp 150000
-
This moves the off-axis probe. NB the robot must be parked <afparkr>
to complete this operation.
-
Move the off-axis mobile probe back to the back position.
-
14:27:00 > afmovp 0
-
This moves the probe to its park position.
Testing the AG heads used for acquisition and guiding
- Turn off all dome lights
- Turn the Wyffos calibration lamps on.
- 14:30:00 > wcal 2 on
- This turns a neon lamp in the calibration unit on
- Take an 1 sec exposure with AG1 (autoguider)
You should
see the ten fiducial bundles now
-
To test AG2 make sure the mobile probe is in the field
-
Take a 1 second exposure with AG2
The mobile
probe should be illuminated now
-
Sleep the robot
-
14:34:30 >afsleep
-
This safely parks robot out of the field and turns the power off.
-
- Take a exposure with wyffos on taurus
- 14:34:30 >run whtwfc 10
- Display in DS9 and analyse with Iraf to see whether there are arclines
visible
Testing WYFFOS
This is not a detailed check but proves communications. Moving other
things like the grating can disturb the observers set-up.
Note: make sure after you issue a wfilt command you wait until it completes
the filter movement and the focus adjustment before giving the next command.
Otherwise the focus correction will not be aplied correctly
-
Check WYFFOS filter slide A
-
14:36:00 > wfilta in
-
14:38:00 > wfilta out
-
Check WYFFOS filter slide B
-
14:40:00 > wfiltb in
-
14:42:00 > wfiltb out
ADC Test.
-
Use the wyffos mimic to display corrector element positions.
-
14:44:00 > adc_auto disable
-
14:47:00 > adc 90
-
14:50:00 > adc -90
-
14:53:00 > adc auto_enable
Testing
WYFFOS Calibration Unit
This assumes that the WYFFOS calibration unit mimic is running.
-
Select a calibration lamp. the process of doing so will turn it on.
-
Select a filter.
-
Select 'broken' on the Nysmith control panel on the telescope engineering
desk.
-
Take an exposure with the ccd.
-
Check that the spectral lines are present on the ccd readout.
-
Select 'GHRIL' on the Nysmith control panel on the telescope engineering
desk.
-
Turn the calibration lamp off.
To Test WYFFOS CCD
-
Turn lights off in the dome.
-
Ensure Nasmyth Flat is stowed for GHRIL.
-
Setup WYFFOS and take a bias frame.
-
15:05:00 > setup wyffos
-
15:10:00 > bias wyffos
-
Check bias frame.
With the daily duty checks complete the last set of checks have to be done
by the astronomer, see section 8.