AF2 and WYFFOS Daily Duty Checks

Any errors or suggestions please email to Michiel van der Hoeven

The following commands that  are to be typed at the ICL command line, are given after the ICL prompt.

Testing AUTOFIB

  1. Waking the robot.
  2. Turn on the WYFFOS back-illumination.
  3. View a science fibre.
  4. View a guide fibre.
  5. Load the small fibre module.
  6. Turn off the backillumination
  7. Park the AF2 Robot
  8. Move the off-axis mobile probe into the field.
  9. Move the off-axis mobile probe back to the back position.
Testing the AG heads used for acquisition and guiding
  1. Turn off all dome lights
  2. Turn the Wyffos calibration lamps on.
  3. Take an 1 sec exposure with AG1 (autoguider)

            You should see the ten fiducial bundles now

  1. To test AG2 make sure the mobile probe is in the field
  2. Take a 1 second exposure with AG2

            The mobile probe should be illuminated now

  1. Sleep the robot
Testing WYFFOS  Spectrograph and CCD

This is not a detailed check but proves communications. Moving other things like the grating can disturb the observers set-up.

Note: make sure after you issue a wfilt command you wait until it completes the filter movement and the focus adjustment before giving the next command. Otherwise the focus correction will not be aplied correctly

  1. Check WYFFOS filter slide A
  2. Check WYFFOS filter slide B
  3. Make sure the Nitrogen flush for the CCD window is switched on (especially in winter with humid conditions) Open epics engineering consul and switch LN2 flow on.
  4. Switch neon lamp on 
  5. Take an exposure with wyffos on taurus 
  6. Switch calibration lamps off
  7. Take a bias frame with wyffos on taurus
Testing the ADC.
  1. Use the wyffos mimic to display corrector element positions.
 

Last updated 17 feb 2005 by MVDH