Autofib/WYFFOS Instrument Change Document

Photo copy this document and tick off check list. When instrument change is complete place in
operations room instrument change filing cabinet.

There is supporting information available on the AF2 web site, which can be accessed from the intranet.  This includes photo's of the change and an AF2/WYFFOS schematic.
 

Date of Instrument Change

Date:
 

Change Team

Change Leader:

Electronics Engineer 1:

Electronics Engineer 2:

Mechanical Engineer 1:

Mecahnical Engineer 2:

Astronomer:


Index

1. PREPARATION (IF OBSERVING SCHEDULE ALLOWS).
1.1 Check that GHRIL is prepared
1.2 Check that the prime focus unit is prepared.
1.3 Check AF2
1.4 Check ancillary equipment.
1.5 Check lifting equipment.
1.6 Check that control room is prepared
2. TELESCOPE PREPARATION.
3. SECONDARY MIRROR REMOVAL.
4. FITTING PRIME FOCUS UNIT.(PFU)
5. FITTING AF2 ROBOT
6. FITTING FIBRE MODULE
7. FIT ANCILLARY ITEMS AT TOP END
8. CABLE-UP TOP END.
9. CONNECT UP SCIENCE AND GUIDE TV FIBRES.
10. BALANCE TELESCOPE.
11. DOES IT ALL WORK?
11.1 Engineering checks
11.1.1 From GHRIL in engineering mode.
11.1.2 From control room
11.2 Astronomy day time checks
11.3 Astronomy night time checks
 

AF2 Equipment


AF2 Cables


Notes

The gripper TV is used for enabling the robot to `see' the fibres and the inspection TV can be used to
allow the user to see inside the robot enclosure.

The control signals to/from the robot are connected into the bottom of AF 2 along with the
cable from the power amplifiers and the TV cables.

The science fibres are carried in blue cables, which are coiled up on the fibre module.  All these cables are run in the `swan neck' up to the top end ring along with the guidefibres which are carried in a black cable and also coiled onto the fibre module.

Fitted at the top end ring is a Westinghouse TV and an interface box.



1. Preparation (If observing schedule allows).

Before the day of the instrument change.

1.1 Check that GHRIL is prepared

The cabling in GHRIL is as follows:


1.2 Check that the Prime Focus Unit is prepared.


1.3 Check AF2


1.4 Check Ancillary equipment.


1.5 Check lifting equipment

1.6 Check control room is prepared


Preparation complete

Date____________

Signed__________________



Instrument Change: Autofib/WYFFOS On. Secondary Mirror Off.

2. Telescope Preparation.

In control room:

At the prime patch panel in the control room, check that the following connections are made: At the A/G fibre patch panel in the control room: At the access park position in the dome: Telescope preparation complete instrument change can start.

NB Do not turn of oil system.
 

3. Secondary Mirror Removal.


4. Fitting Prime Focus Unit.(PFU)

NB great care must be taken when placing the PFU in the telescope. This is because the crane beam
and telescope axes are not orthogonal.


5. Fitting AF2 Robot

Test that the robot works from GHRIL:


6. Fitting Fibre Module


7. Fit Ancillary items at top end


8. Cable-UP Top end.


9. Connect up Science and Guide TV fibres.


10. Balance Telescope.


11. Does it all work?

11.1 Engineering Checks

11.1.1 From GHRIL in Engineering mode.

Start AF2 Micro.

Loadfibres and view on TV.


11.1.2 From Control room


11.1.3 Duty Checks


11.2 Astronomy Checks (day time)


Engineering Checks and Astronomy day time checks complete

Signed Instrument Change leader___________________________ date/time

11.3 Astronomy night time checks


Instrument Change complete

Signed Duty Officer _________________________________________ date/time


Created by Stephen Goodsell