OFFLINE WORK ACTIONS
Pupil Stop Z Axis Adjustment |
| 1.1 | Identify JH, K NAOMI stops | Maarten | asap | active |
| 1.2 | Compute optimum positions | Maarten | asap | active |
| 1.4 | Test results of adjustment and report | Chris | asap | active |
|
K Band NAOMI Glow |
| 2.1 | Identify source | Paul | asap | active |
| 2.2 | Correct source | Paul | asap | active |
|
Pupil Imager Characterization |
| 3.1 | Analyse pupil imager theoretical image quality | Maarten | asap | active |
| 3.2 | Analyse focus difference for NAOMI JH, K pupil stops | Maarten | asap | active |
| 3.3 | If favourable, optimise pupil imager for NAOMI use only | Paul / Maarten | asap | active |
|
Pupil Stop and OSCA Mask Tangental Positions |
| 4.1 | Characterize | Chris | asap | active |
| 4.2 | Adjust EPICS tables | Dennis | asap | active |
|
Thermal Management (Reduce Detector Temp.) |
| 5.1 | Calculate and engineer | Paul / Peter | asap | active |
|
Documentation |
| 6.1 | Mechanical | Paul | asap | active |
| 6.4 | Scripts and reduction sw | ??? | asap | active |
|
Epics Pupil Imager Control |
| 7.1 | Test EPICS control sequencing | Dennis | on hold | active |
|
Cassagrain Mounting Bracket |
| 8.1 | Improve decoupling of axis | Paul | asap | active |
| 8.2 | Allow co-focal with AutoGuider | Paul | asap | active |
|
Electronics Rack |
| 9.1 | Complete light weight unit | Kevin | asap | active |
| 9.2 | Fabricate and install Preamp clamp | Kevin | asap | active |
|
LN2 Filler shield |
| 10.1 | Fabricate and install | Kevin | asap | active |
|
Detector Noise Reduction |
| 11.1 | Further optimization | Peter | asap | active |
|
A&G Box Large Flat |
| 13.1 | Test for correct operation at all angles | Peter | asap | active |
|
Completion of Commissioning Tests |
| 15.1 | Analyse remaining tests for usefulness | Paul / Johan / Almu / Peter | asap | active |
| 15.2 | Repeat test 2.5.2 - Filter repeatability | Johan / Almu | asap | active |
| 15.3 | Repeat test 3.1.3 - Total system flexure test | Johan / Almu | asap | active |
| 15.4 | 2.5.2 Repeatability of filters | Johan / Almu | asap | active |
| 15.5 | 2.7.7 Folding flat repeatability | Johan / Almu | asap | active |
| 15.6 | 2.8.3 Long term bias stability | Johan / Almu | asap | active |
| 15.7 | 2.8.5 Stability after power cycle | Johan / Almu | asap | active |
| 15.8 | 2.8.7 Flat field stability | Johan / Almu | asap | active |
| 15.9 | 3.0.2 Focus offsets | Johan / Almu | asap | active |
| 15.10 | 3.1.2 Plate scale and flexure | Johan / Almu | asap | active |
| 15.11 | 3.6 Long term flat field stab. | Johan / Almu | asap | active |
| 15.12 | 4.1 Dithering with autoguiding | Johan / Almu | asap | active |
| 15.13 | 4.2 Dithering with autoguiding | Johan / Almu | asap | active |
| 15.14 | 4.5.1 Pupil stop efficiency | Johan / Almu | asap | active |
| 15.15 | 4.5.2 Pupil stop efficiency | Johan / Almu | asap | active |
| 15.16 | 5.3 Vignetting of field | Johan / Almu | asap | active |
| 15.17 | 5.5 Focus stability | Johan / Almu | asap | active |
| 15.18 | 5.6 Autoguider vignetting | Johan / Almu | asap | active |
| 15.19 | 5.7 Secondary baffle emmisions | Johan / Almu | asap | active |
| 15.20 | 5.9 MNDR RON characterization | Johan / Almu | asap | active |
|
INGRID Cosmetics |
| 16.1 | Design INGRID logo | anybody ! | asap | active |
| 16.2 | Fabricate and fit name plate | Kevin | asap | active |
| 16.3 | Coat / paint vacuum jacket | Kevin / Paul | asap | active |
|
INGRID UltraDas Commissioning |
| 17.1 | Test and evaluate UltraDas <--> SDSU code | Richard / Peter | asap | active |
| 17.2 | Install software at WHT | Richard / Dennis | asap | active |
| 17.3 | Test and evaluate system | Richard / Dennis | asap | active |
| 17.4 | UltraDas commissioning at Cass | Richard / Dennis | asap | active |
| 17.5 | UltraDas commissioning for NAOMI | Richard / Dennis | asap | active |
|
AutoGuider Commissioning |
| 18.1 | Build code | Sheila | asap | active |
| 18.2 | Autoguider commissioning at Cass | Sheila / Richard | asap | active |
|
Replacement of Cryogenic stepper motors |
| 19.1 | Contact Univ. Hawaii for report | Paul | URGENT | active |
| 19.2 | Issue report on feasability | Paul | URGENT | active |
| 19.3 | Procure replacement stepper motors | Paul | URGENT | active |
| 19.4 | Design and fabricate mounting brackets | Paul / Kevin | asap | active |
| 19.5 | Update EPICS motor records | Paul / Dennis | asap | active |
|
Closed Cycle Cooler Reliability |
| 20.1 | Eliminate He Leaks | Kevin | asap | active |
| 20.2 | Install He line cold trap | Kevin | URGENT | active |
|
Datum Switch Reliability |
| 21.1 | Contact IAC and report | Peter | asap | active |
|
Electronics Spares |
| 23.1 | Assemble and test spare SDSU controller | Peter | asap | active |
| 23.2 | Prepare spare power supply and detector cable harness assy. | Peter | asap | active |
|
COMPLETED WORK ACTIONS
|
Documentation |
| 6.2 | Electrical | Peter | 30/11/01 | done |
| 6.3 | Operational | Almu | 30/11/01 | done |
| 6.3 | Web Pages | Almu | 30/11/01 | done |
|
Integration Timing Characterization |
| 14.1 | Test and document Version 3.1 | Almu / Peter | 30/11/01 | done |
| 14.2 | Test and document Version 3.2 | Almu / Peter | 30/11/01 | done |
| 14.3 | Test and document Version 4.0 | Almu / Peter | 30/11/01 | done |
|
Completion of Commissioning Tests |
| 15.2 | Repeat test 2.5.2 - Filter repeatability | Johan / Almu | 30/11/01 | done |
| 15.3 | Repeat test 3.1.3 - Total system flexure test | Johan / Almu | 30/11/01 | removed |
| 15.4 | 2.5.2 Repeatability of filters | Johan / Almu | 30/11/01 | done |
| 15.7 | 2.8.5 Stability after power cycle | Johan / Almu | 30/11/01 | removed |
| 15.9 | 3.0.2 Focus offsets | Johan / Almu | 30/11/01 | done |
| 15.10 | 3.1.2 Plate scale and flexure | Johan / Almu | 30/11/01 | done |
| 15.17 | 5.5 Focus stability | Johan / Almu | 30/11/01 | done |
| 15.18 | 5.6 Autoguider vignetting | Johan / Almu | 30/11/01 | done |
| 15.20 | 5.9 MNDR RON characterization | Johan / Almu | 30/11/01 | done |
|