Document number:
AOW/GEN/RAH/6.1/10/97GHRIL/TFS Services
Version date: 9 October 1997
This document outlines the
services required for NAOMI at GHRIL and the Test Focal Station (TFS). More
detail will be provided as the NAOMI design progresses.
W
DM rack (with Xinetics mirror, peak requirement) 800
OMC racks (2) (peak
requirement) 490
WFS (average) 205
TTS (WFS duplicate) 205
Figure sensor (estimate) 100
Workstations 200
Total:
2000
Adding a 50% contingency (to cover all peak loads and auxiliary equipment)
we have 3kW.
A global heat removal system
from GHRIL is likely to be required. Approach is to be determined (subject to
availability of funding). Initial operation should be planned to be without a
global system.
Ideal approach: Positive
pressure environment with filtered input air.
Minimum requirements:
a) Minimise dust entry via
Nasmyth port and seal joints in walls and roof as appropriate.
b) Check door seals for
effectiveness and correct any deficiencies.
c) Take measures to prevent
dust entry when roof hatches are opened.
Purge to prevent condensation
and dust on critical optical components. The frequency of operation of the
purge and the flow rate are yet to be determined. Both will depend on the
cleanliness achieved at GHRIL.
a) Three-way voice
communications between GHRIL, WHT control
room and GHRIL control room. (Hands-free in GHRIL control and optics
rooms, headset in WHT control.)
b) Video cameras in GHRIL
control and optics room, monitor in WHT control room.
GHRIL control and optics
rooms to WHT control.
To be defined in Interface
Control Documents.
Although the earthing is
believed satisfactory based on E-0 experience, a review of the GHRIL earth
system is recommended. Two types of earth may be required; a heavy duty copper cable/strap with
attachment points for equipment (including the bench) and a braided earth for
the dissipation of electrostatic charge.
a) Add fire/smoke detection
and integrate into WHT fire warning system
b) Add extra fire
extinguisher (one for each GHRIL area)
c) Review gate interlock
hardware
d) Add GHRIL/UES illuminated
indicator (to avoid choosing wrong gate).
a) Provide hatch in GHRIL
roof above WFS to allow installation and removal using dome crane. Note that
WFS has its own lifting frame which was described at the PDR. The hatch opening
should be at least 1.0 m by 1.2 m. It should be positioned over the footprint
of the WFS on the GHRIL table.
b) Move double doors to
provide easier access to GHRIL optics room.
a) Voice communications
between the WHT control room and the
TFS. (Hands-free in the TFS, headset in WHT control.)
b) Video camera in the TFS
optical table area.
TFS to WHT control room.
TBD