WHT commissioning-time summary


WHT commissioning 1989-2000 and observing 1997-1999 % by instrument
-------------------------------------------------------------------

The table below summarises nights used for WHT commissioning
1/2/1989 - 31/1/2000, broken down by instrument.
At 1/2/89 ISIS, FOS-2 and TAURUS were all in use, although some of their
commissioning remained to be done.  I have no schedules from before
1/2/89 (and the observing logs 1987-9 don't clearly identify work 
done on commissioning nights).  
The numbers below are approximate e.g. occasional D nights used for 
minor and CCD commissioning work won't be included.  
Some of the commissioning is ongoing.

During 1/1/97 - 31/12/99 (1095 nights), 856 nights were scheduled for 
observing
(the remaining 239 nights were commissioning or S/D).  
The last column gives % of these 856 nights scheduled with each 
instrument.


     Instrument             Period      Comm. runs  Total nights  % use
                                                                  97-99
Common-user instruments
-----------------------
ISIS (in use at 2/89)     7/89              1           42          42
TAURUS (in use at 2/89)  12/89 -  1/91      2           14           5

ISIS polarisation unit   10/89 -  7/96      7           22        
UES                       6/91 -  9/94      6           50          16      
LDSS                      3/92 -  8/92      2           19           6
PF imaging               11/93 -  9/94      4           38          10
AF2/WYFFOS(*)            10/94 -  8/98     12           52           7
WHIRCAM                   2/95 -  6/95      2            4.5         5
INTEGRAL                 11/96 -  7/97      3           11           4
Aux-port                                                             0.6

Own instruments
---------------
FLEX                      4/89              1            3
IPD in GHRIL              4/89              1            2
IR photometer (Leic.?)    12/90             1            4
HHS                       9/92              1            5
MTI                       2/95              1            1
CIRSI                     1/98              1            2           1.3
SAURON                    2/99              1            3           1.6
STJ                       2/99 - 12/99      2            6
GHRIL (unknown instr.)    3/89              1            4
GHRIL (misc.)                                                        0.7
TRIFFID                                                              0.4

AO and related work
-------------------
MARTINI                   6/95 -  8/96      2            6
ELECTRA                   6/97 -  6/99      3           18
NAOMI                     8/00 -  9/00      2           11
TEIFU                     9/99              1            2
LGS                       9/99 -  1/00      2            2

(JOSE programme          11/95 -  8/98      9           13)

General telescope work 
----------------------
Misc standdowns + tel.
  commissioning           2/89 - 12/93     10           40

Cass A&G                  5/89              1           29
Dome standdown            9/89              1           31
Secondary mirror          3/90              1            7
Cass rotator              6/90              1           30
Nasmyth alignment        10/90 -  3/91      2           11
Cass autoguider           9/94              1            2
New control desk          3/95              1            2
CFX (control file
     observing)            2/90 - 12/90     2           11
Tube straightening        11/92             1            4
Alpha TCS                 11/96 - 10/98     6           21

* Often no clear distinction was made in the schedules between nights
for AF2 and WYFFOS commissioning.  4 nights were also used in 4/90 for
AUTOFIB, but this might have been AUTOFIB-1.

The % use entry for ISIS includes ISIS polarisation.


Chris Benn (crb@ing.iac.es)

1999 Dec 7, version 2000 Sep 22

Click here to return to WHT home page